Substations 110/380 kV

Substations 110/380 kV

Turnkey in the EPC(M) model: planning, procurement, construction and commissioning – in record time.

01

EPC(M) Scope of Services

Planning. Procurement. Construction.

Planning

Complete engineering in line with our grid connection engineering services – from concept to detailed design.

Procurement

Long-term supply agreements with renowned manufacturers ensure predictable delivery times.

8–12 months
Main transformer

5–8 months
HV/MV switchgear

Construction

Proven, fast construction process – civil and electrical works included.

2–3 months
110 kV civil works

Construction times by work package

Work package110 kV380 kV
Civil works2–3 months3–4 months
Electrical works incl. installation, commissioning & grid integration2–3 months3–4 months

02

Capacity Classes

Power classes and typical configurations

 40–80 MVA63–120 MVA>100 MVA
Main transformer1 transformer1 transformer, double splitMultiple transformers
HV baysAIS / HGIS / GISAIS / HGIS / GISAIS / HGIS / GIS
MV sideMV GIS, single busbarMV GIS, sectionalised busbarMV GIS, multi-sectionalised busbar
Reactive power compensationCapacitor Bank / SVGCapacitor Bank / SVGCapacitor Bank / SVG

AIS vs. GIS – technology comparison

AIS — Air-Insulated Switchgear

GIS — Gas-Insulated Switchgear

03

Alternative Construction Method

Prefabricated Substation

As an alternative to conventional construction: fully prefabricated stations.

Prefabricated and Modular Substation Solutions

Prefabricated modular substation